COTIZACIÓN
|    NO.  |  ARTÍCULODESCRIPCIÓN |    FOTO  |     ESPECIFICACIÓN  |    PESO  |  CANTIDAD(PCS/20GP) |   ENGAÑAR Tianjin  |     Rarakr  |  
|   KG/PC  |    USD/pieza  |  ||||||
|    1  |  BS1139 Drop Forged Doble Coplr |    |     48.3*48.3 mm  |     0.98  |     27,000  |     $ 0.996  |  |
|    2  |  BS1139 Drop Forged Swive L Copler |    |     48.3*48.3 mm  |     1.15  |     23,000  |     $ 1.150  |  |
|    3  |  BS1139 Mangeve Pressed Couprr |   |     48.3 mm  |     1.00  |     26,500  |     $ 0.947  |  |
 
 1: 7.20; 
  |  |||||||
|    4  |  BS1139 Drop Forged Board de retención CoUplr |    |     48.3 mm  |     0.63  |     42,000  |     $ 0.670  |  |
|    |  |||||||
|   5  |  BS1139 Drop Forged Putlog Copler | 48.3 mm |   0.63  |    42,000  |    $ 0.670  |  ||
|    6  |  BS1139 Drop Forged Weam/Beam Coupler |   |     48.3 mm  |     1.50  |     17,650  |     $ 1.595  |  |
|    7  |  BS1139 Drop Forged Ladder Clamp |    |     48.3*48.3 mm  |     0.68  |     39,000  |     $ 0.802  |  |
|   TOTAL:  |    217,150  |  ||||||
OBSERVACIÓN:
- El precio se basa en la cantidad y observaciones de pedidos anteriores.
 - Embalaje: embalaje de exportación estándar, adecuado para el transporte marítimo.
 - Término de pago: TT 30% Advace, saldo de Aganis con documento BL.
 - Calidad/Tolerencia: se realiza con el estándar BS1139/EN39.
 - Tiempo de entrega: 20-30 días hábiles después de recibir el pago anticipado
 - Validez de precios: 3 días.
 
Tiempo de publicación: junio de junio-2024