What issues should be considered in the scaffolding construction plan

Before scaffolding is built, the customization of the construction plan is an important part. The construction plan is a criterion for standardizing the behavior of construction workers, and it is a regulation formulated to more reliably ensure the safety of workers.

Of course, when the re-construction plan is determined, safety issues need to be considered. Then, what issues need to be considered when formulating the scaffolding construction plan?

The first is the construction time and quality requirements. The structural problem of scaffolding is the key point related to the safety of the scaffolding. The price of the scaffolding also determines the level of the project cost. Therefore, the cost-effective scaffolding is our standard for purchasing scaffolding. . During the construction process, the scaffolding built must meet the safety and durability. It cannot be damaged when used during the construction process. Whether it is maintenance or replacement, it will not only affect the construction process, but also increase the cost of construction.

Second, the load-bearing capacity of the scaffolding. As we all know, scaffolding is a kind of support built to solve the problem of vertical and horizontal transportation of workers. Therefore, it has a relatively strong ability to carry heavy objects, and it is also convenient for dismantling and inspection. The scaffolding should be built in accordance with the national regulations. Of course, some regions may also operate according to local codes.

Third, the scaffolding tubes should be maintained before use. Most scaffoldings are made of iron or steel, so first of all, anti-rust treatment should be done and painted, generally the same color, green is used more , looks good on the eyes. The guardrails and the foot poles are colored yellow, so that it is easy to notice that the poles standing underneath are white and red. The safety net is also very important. It should be a dense mesh type, and there should be 2,000 meshes per 100 square centimeters, and a durability test should be done.

The scaffolding construction plan should be prepared according to the above principles, but the plan should be trimmed according to different construction areas of different projects to ensure the feasibility of the construction plan.


Post time: Feb-21-2022


We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept