Introduction to the safety plan for dismantling the frame of the buckle scaffold:
1. When dismantling the frame of the buckle scaffold, the personnel must wear safety helmets, fasten safety belts, and wear flat shoes when entering the site.
2. Before dismantling the buckle scaffold, a 5-meter warning area should be set up around the frame. Non-staff members are not allowed to enter the working area. During the dismantling of the buckle scaffold, a full-time safety officer should be assigned, or the team leader should serve concurrently.
3. During the erection and dismantling of the buckle scaffold, full-time warning personnel should be set up to manage the construction personnel and vehicles of other types of work in the dismantling area of the buckle scaffold to carry out warning and coordination.
4. When dismantling the buckle scaffold, the established dismantling plan should be followed. According to the actual situation of the erection of the buckle scaffold, height, etc., the dismantling construction should be planned.
Why do many projects use buckle scaffolds? The safety of construction workers is more guaranteed. The high-strength Q345 vertical poles of the disc-lock scaffolding have a load capacity of up to 200KN, and with the diagonal rods at each node, the frame has better bearing capacity and stability!