How much do you know about the correlation between scaffolding accidents and scaffolding wall ties

Standard practices for scaffolding wall ties, just remember the following 6 key points!
1. Scaffolding wall ties should be able to withstand tension and pressure
2. They should be set horizontally and within 300mm of the main node
3. Scaffolding wall ties must be set at both ends of the open frame, with a vertical spacing not greater than the floor height and not greater than 4m
4. The number and spacing should strictly comply with the requirements of the plan, with a maximum of three steps and three spans
5. When the first step frame cannot be set with scaffolding wall ties, a full-length brace must be set with an elevation angle of 45°~60°
6. The cantilever length of the scaffolding above the wall ties does not exceed 2 steps.

Next, we want to emphasize the safety and quality monitoring measures during the installation of scaffolding wall ties.
1. The installation process requires professional guidance and supervision: The installation of scaffolding wall parts must be performed by professionals with relevant qualifications, and the installation process must be supervised by the on-site safety officer to ensure that each step of the operation complies with the specifications and any potential safety hazards are discovered and corrected in a timely manner.
2. Regular inspection and maintenance: After the installation of the scaffolding wall parts is completed, they should be inspected regularly (such as weekly or after a certain amount of work is completed) to confirm whether the connection is firm and whether there is any looseness, deformation, or damage. For any problems found, repair or replacement measures should be taken immediately to ensure that the scaffolding wall parts are always in good working condition.
3. Reinforcement measures for special weather and environment: Under severe weather conditions such as strong winds, heavy rains, ice, and snow, special inspections should be carried out on scaffolding wall parts, and temporary reinforcement measures should be added if necessary, such as adding temporary tie-downs or strengthening supports to enhance the overall stability and wind resistance of the frame.
4. Education and training: Provide safety education and skills training to all personnel involved in scaffolding erection and wall connection installation, so that they can fully understand the importance, installation standards, inspection points, and emergency response measures of scaffolding wall connections, and improve the safety awareness and operation skills of all personnel.
5. Documentation and traceability: Establish a complete installation, inspection, and maintenance record system, and record the installation location, time, inspection status, maintenance records, and other information on scaffolding wall connections in detail for future tracing and auditing to ensure the traceability and systematic nature of safety management work.

Through strict control of the above key points, we can effectively improve the safety and reliability of scaffolding wall connections and provide solid guarantees for the smooth progress of construction projects.