How many risk control measures tips for scaffolding

1. Scaffolding construction plans should be prepared and approved promptly, and safety technical briefings should be signed by each worker.

2. Workers must be certified and wear safety belts, safety helmets, and non-slip shoes;

3. Qualified products should be used for steel pipes and couplers. Channel steel is strictly prohibited for cantilever scaffolding, and steel wire ropes should be used for steel cantilever beams.

4. Dense mesh netting should be tightly installed on the scaffolding, and horizontal netting protection should be complete and tightly installed.

5. The longitudinal and transverse spacing of uprights must strictly adhere to the plan requirements; overlapping or extending of uprights is strictly prohibited, as is installation within the same horizontal plane.

6. The lower ground-level bracing and horizontal bars of the scaffolding must be erected strictly according to the plan;

7. All wall ties and scissor bracing should be in place, and unauthorized removal of poles and couplers is strictly prohibited.

8. The bottom and construction layers of scaffold boards should be fully laid as required by the plan.