1. Before the operation, carefully check whether the working environment is reliable and whether the protective facilities are complete. After checking, you can start the operation.
2. During the operation, pay attention to timely cleaning up the materials that fall on the surface of the frame, keep the surface of the ball bearing neat and clean, and do not pile up materials and tools randomly to avoid accidents caused by falling objects during the operation.
3. When prying, pulling, pushing, etc., pay attention to using the correct method, keep your heels steady, or hold one hand on a solid structural support to prevent excessive force, imbalance, or throwing things out.
4. When removing the formwork on the scaffolding, take corresponding shoulder measures to prevent the removed formwork materials from bursting out of the frame.
5. Whether the construction load in the scaffolding working layer meets the requirements and cannot be overweight. It is forbidden to concentrate the stacking of formwork, steel bars, and other items on the scaffolding, and it is strictly forbidden to pull the wind rope up to fix the scaffolding, build formwork support frames and concrete pumping pipelines, etc.
6. Do not throw materials, tools, welding rods, and other objects during the operation. Items that are easy to break, such as steel pipe fasteners and anchor bolts, should be put into the electrician’s tool bag.
7. When a group lifts a long prefabricated component, there should be a full-time person to guide, act in unison, and fall quickly, and be careful not to hurt the surrounding personnel.
8. Do not hang it up to play, rest, or sleep, and it is strictly forbidden to release the work after drinking.
9. Protective measures should be taken for release work after rain or snow, and the snow should be cleared.
10. Outdoor scaffolding work is strictly prohibited in weather such as six or more strong winds, heavy rain, snow, and dense fog. Special measures should be taken for scaffolding work after thunderstorms and typhoons.
11. During equipment installation and pipeline insulation work, the scaffolding should be separated from the work platform to ensure that the connection is firm. There should be anti-falling measures at the passageways, stairwells, and reserved holes for scaffolding assembly in the actual operation platform.
12. When using the scaffolding, the components’ set joints should be regularly maintained to ensure they are intact and reliable. If the screws are loose, damaged, or the iron frame is crooked, the structure should be reinforced and replaced in time.
13. Before dismantling the scaffolding, it should be cleaned, maintained, and reinforced. When dismantling, it should be carried out from top to bottom, first erected and then dismantled.