Safety instructions for using scaffolding products

Social progress leads the development in various engineering projects. No matter the house building, boat industry or airplane construction, lots of bosses shall adopt convenient equipment for work. And thus, scaffolding products from frame scaffolding to a scaffolding base jack, should be taken safety into account.

 

There is safety instruction for it, and each of us need to keep in mind for safety.

First of all, before the erection of multi-pole scaffold, we should set the construction plan and the construction form shall be determined according to the plane form, size, and height and construction technology of the building.

Second, same kind of raw material for the scaffolding is necessary. Steel scaffold joints should be fastened with fasteners, not with lead wire binding.

What’s more, the pole of steel tube scaffold shall be placed vertically on the metal base, and then we should set a thick board placed below according to our installation requirement.

In addition, the adjacent joints of the vertical bar should stagger. A small bar must be set at the node of the pole. The bar at the node cannot be removed before the scaffold is removed.

 

Safety would be on the top list when we use scaffolding for engineering projects. Thus, be prepared for each detail is necessary.


Post time: Dec-25-2019